F I R S T   T H E R E   W A S   A   S T O N E . . .
Tel: 604.552.2115
Fax:604.552.0401
 
Products  

Canopies for pillars and pedestals- Instruction

 

Technical Information of Installment of Canopy

During production canopies has air raid on the surface from the dye, which must be removed before or after installment. This is subordinated from the material that the fence has been made from.

If the fence is clearcoled and painted brightly; it has been finished on both sides for example paved ankle or it is freshly lined, then before installment the canopy must be washed down with currently flowing water.
Before the installment the canopies must be dry, and the surface of installment on the fence must be clearcoled.

If the fence is finished from clinker brick, or after installment of canopies it will be eventually painted or eventually glued with elevation slabs (sandstone, clinker) it is possible to rinse canopy on roaches directly but at least three days after sticking. Early cleaning will cause rinsing of cement from glue and the distribution of the glue on the surface of the fence and also considerable attenuation of mortars and the rending of canopy from fence.

It is best to rinse canopies with a soft brush under current water. Canopies on pedestals are best to connect “on eye”, and delicately fill emerged slots with universal colorless silicon. Silicon swindles paints of canopy and it is almost invisible.

Capillary under the canopy must be removed further from the surface of the fence at least 10mm, which guarantees no leaking of water on the surface of the fence.

 

 
© Stegu 2006